Know what the robots need before the slab is poured.
Tenants are asking whether a building can take automation, now or five years from now. This automation ready building checklist covers what an integrator checks first: floor flatness, power, clear height, racking and robot layout, and permitting. Use it to spec a new building, qualify an existing one, or plan a retrofit that does not end in a tear out.
A driver steers around a dip in the slab, nudges a pallet into a tight bay and keeps working under a light that is out. A shuttle, stacker crane or autonomous mobile robot does none of that. It needs the building to be exactly where the drawings say it is, every shift.
That makes automation readiness a building question first and an equipment question second. The automated pallet racking systems and AMR warehouse solutions tenants are evaluating all depend on the same physical attributes. Get them right during design or before the next lease, and automation becomes an upgrade. Miss them, and it becomes a construction project. This checklist is part of our warehouse automation support.
An automation ready warehouse simply removes the obstacles. The tenant decides when, and which system, without fighting the slab, the panel or the permit.

Flatness, levelness, joints and load capacity, measured and documented rather than assumed.
Service size, panel capacity and charger locations for fleets that may run around the clock.
Usable height under the lowest obstruction after sprinkler clearance, not the number on the flyer.
Column grid, aisle widths, rack tolerances and room for chargers, conveyor and growth.
Wireless coverage in every aisle, plus lighting, temperature and dust control.
High pile storage, fire protection, seismic, electrical and building approvals, sequenced early.
Floor flatness is usually measured with F-numbers under ASTM E1155: FF for flatness, the bumps and dips, and FL for levelness, the overall tilt. Many warehouses are poured to a random traffic spec that works well for forklifts. Very narrow aisle trucks, stacker cranes and some guided vehicles often need a tighter, defined traffic tolerance measured along their actual wheel paths.

Automated fleets charge continuously, often around the clock, and the control systems behind them need clean, reliable power. Utility upgrades, transformers and switchgear can carry long lead times, so power is often the item most likely to delay a go live date.
Automation earns its keep by using height a forklift driver cannot safely reach. The height that matters is not the eave or the flyer number. It is the distance from the slab to the lowest obstruction, minus the clearance the sprinkler system requires above the top of storage.

The rack is the structure every automated system stands on. Robots and cranes stop where a driver would simply adjust, so layout and tolerances need to be set with automation in mind, even if the first tenant runs forklifts.
Already have rack in the building? Our warehouse racking team inspects condition and tolerances first. For new installs, selective pallet racking can be engineered to automation tolerances today, so a future retrofit is an upgrade rather than a rebuild.
A site survey that proves strong signal down every racked aisle, at every height the equipment works.
Fiber or cabling to network closets, with room for control servers and redundancy.
Even, glare free light helps camera and vision guided systems as much as it helps people.
Batteries, sensors and electronics have operating ranges. Note cold zones, heat and dust sources.
Dense automated storage is almost always high piled storage. Under the International Fire Code, that generally means combustible storage over 12 feet high, or over 6 feet for high hazard commodities, and it brings a fire review on top of the building permit.
We handle high pile storage permits in house, so the design and the permit move together.

Drawings, floor survey, sprinkler design and the electrical one line.
On site check of slab, columns, obstructions, power and coverage.
Compare the building against the systems the tenant is considering.
An automation ready rack plan with space reserved for growth.
Map the high pile, fire, seismic and electrical approvals.
What is ready, what needs work and what it will take to close the gaps.
Write slab, power and clear height targets into the base building spec so the space markets as automation ready from day one.
Qualify a vacant or turning building and price the gaps. When upgrades are needed, our warehouse tenant improvement team can scope them.
Bringing in an integrator? Read about the value of a warehouse automation integrator, and see how autonomous mobile robots fit into existing buildings.
A warehouse whose slab, power, clear height, layout, connectivity and permits can support automated storage or mobile robots without major rework. It does not need robots installed. It just has no obstacles to adding them.
It depends on the equipment. Many autonomous mobile robots work on a typical warehouse floor if joints and cracks are in good condition, while very narrow aisle trucks and stacker cranes usually need tighter, defined traffic tolerances along their wheel paths. Get the specification from the equipment supplier and compare it to a current floor survey.
There is no single minimum. More usable height generally means more pallet positions per square foot, which improves payback. What matters is the height below the lowest obstruction after the required sprinkler clearance.
They need charging stations on dedicated circuits, panel capacity for the full fleet and reliable power for network and control equipment. Large fleets and automated storage systems may require a service upgrade, which can take months.
Usually, yes. Dense automated storage is typically high piled combustible storage, which the fire authority reviews for commodity, height, sprinklers and access. SOURCE Racks handles high pile permits in house.
Often, yes. Floors can be ground or topped, power can be added, and rack can be inspected or replaced to tighter tolerances. A readiness review shows which upgrades are needed and in what order.
Owners and developers own the building items like slab, power and clear height. Tenants and integrators own the equipment choice. A racking partner that handles layout and permits connects the two.

Send us your drawings or book a walkthrough. We will tell you what is ready, what needs work, and how to get the rack, permits and layout right the first time.