After "will it fit," the next question every tenant asks is "how long until we can use it." In most warehouses, the permit is the answer. Our high pile storage permits, stamped drawings and seismic calculations come from the same team that designs and installs your rack.

01 / The Basics

When storage becomes
high piled storage.

Under the International Fire Code and state versions of it, like the California Fire Code, combustible material stored higher than 12 feet is generally treated as high piled combustible storage. For high hazard commodities, the threshold drops to 6 feet. Large storage areas can trigger requirements on their own.

Once storage is high piled, the fire authority wants to see what you store, how high, how much area it covers, and how the building will protect it: commodity class, aisle widths, flue spaces, sprinkler design, fire department access and, in some cases, smoke removal.

Two approvals, not one

Most racking projects need a fire review for the high pile storage and a building permit for the rack structure itself. Thresholds vary by jurisdiction, so we confirm requirements with the local authority on every project.

In rack sprinkler and flue space clearance reviewed for a high pile storage permit
Flue space and sprinkler clearance, resolved on paper instead of in the field.
02 / What We Produce

Every package, prepared in house
and built to pass the first time.

01

Commodity classification

Your inventory classified by commodity class, including plastics and high hazard materials, because classification drives everything else in the review.

02

High pile storage plans

Storage areas, heights, aisle widths, flue spaces, egress and fire department access documented the way plan check expects.

03

Stamped racking drawings

Rack elevations, beam levels and load capacities on drawings stamped by a licensed engineer.

04

Seismic calculations

Seismic design and anchoring specifications sized to real pallet weights, following ASCE 7 and the ANSI MH16.1 rack standard.

05

Sprinkler coordination

In rack sprinkler needs, deflector clearance and flue space worked out with your fire protection contractor before submittal.

06

Plan check and inspection

We answer plan check comments directly and coordinate inspections, so your crew is never waiting on a sign off.

03 / Why It Wins Deals

Permitting is why
projects open on time.

Most racking vendors hand the permit to a subcontractor and hope. When plan check sends comments back, drawings travel between three companies before anyone answers. Weeks disappear.

Our permit team sits next to our designers. The layout is drawn to be permittable from day one, and when a comment comes back, the person who drew it answers it.

Timeline during the dealA realistic permit schedule before the lease is signed.
No late surprisesStorage height and sprinkler issues found on paper.
One team accountableFrom the first plan to final inspection.
High pile storage permit drawings and racking seismic calculations prepared by SOURCE Racks
04 / Process

How a permit moves through our team.

01

Classify

What you store, how it is packaged and how high it goes.

02

Design

Layout set around clear height, sprinklers and fire access.

03

Engineer

Seismic calculations, anchoring and slab review sized to real loads.

04

Submit

Complete high pile and building packages go to the local authority.

05

Respond

Plan check answered directly by the team that drew the plan.

06

Inspect

Inspections coordinated with installation through final sign off.

05 / Problems We Catch Early

The details that stop racking projects.

Every permit package ties into our full warehouse racking design and install scope, so these get solved before submittal.

Sprinkler clearance

Top of storage set too close to sprinkler deflectors, which forces a lower rack or a sprinkler change.

Plastics and aerosols

Commodities that change the protection the building needs and can limit storage height.

Blocked flue spaces

Solid decking or tight pallet placement that blocks the gaps sprinklers rely on.

High density systems

Layouts like drive in racking that may need extra fire protection review.

Existing unpermitted rack

Racking left by a prior tenant that was never approved, which becomes the new tenant's problem.

Seismic and slab capacity

Base plates, anchors and slab loads in high seismic markets like California.

06 / For Brokers and Owners

Ask the permit question
during due diligence.

Whether a building can be permitted for the tenant's storage is a leasing question, not just a construction one. Brokers and owners in our Solve program get permit feasibility, rack plans and budget ranges while the deal is still live. You can also browse our case studies to see permitted projects from start to finish.

07 / FAQ

Frequently asked questions

In many jurisdictions, yes. Racks above a certain height usually need a building permit, and storage above 12 feet (6 feet for high hazard commodities) usually needs a high pile storage review by the fire authority. Requirements vary by city and county, so we confirm them for every project.

It is the fire authority's approval to store combustible goods above the high pile threshold. It covers commodity classification, storage height and area, aisle and flue spaces, sprinkler protection and fire department access.

It depends on the jurisdiction and how complete the submittal is. Because we prepare the package in house and answer plan check directly, we can give you a realistic timeline for your city at the start of the project.

Yes. Rack drawings and seismic calculations are stamped by a licensed engineer and include anchoring specifications sized to your actual pallet weights.

Yes. We can review existing racking, identify what is needed to bring it into compliance and advise whether reusing it makes sense for the new operation.

Nationwide. We work with local jurisdictions across the country regularly and know what each one expects.

Start Your Project

Get the permit right the first time.

Tell us what you are storing, how high, and where the building is. Our permit team will tell you what it takes to get approved.