Get estimate within 24 hours

One contractor. One schedule. One person to call.
Signing the lease is the easy part. Between the keys and the first outbound truck sits racking, permits, lighting, sprinklers, electrical, equipment and the office. SOURCE Racks takes an empty warehouse to move-in ready under one project team.
Industrial tenant improvement rarely fails inside a single scope. It fails at the handoffs between them, and the tenant is the one left waiting.
A warehouse TI is a coordination problem as much as a construction problem. Here is what our team handles under one project.
Selective, push back, pallet flow, drive in, cantilever, mezzanines and catwalks, sourced used or new and spec'd to real pallet weights.
High pile storage permits, stamped drawings, seismic calculations, anchoring specs and plan check response, all in house.
Warehouse LED lighting laid out over the final aisles and installed during the racking install.
In rack requirements, flue space and deflector clearance coordinated with your fire protection contractor and the local authority.
Power for forklift chargers, dock equipment, conveyor and office circuits, planned around the layout through our vetted partner network.
Forklifts, conveyors and dock equipment matched to aisle width and clear height. See our warehouse equipment scope.
Workstations, private offices, conference rooms and break rooms, delivered and installed while our crews are already on site.
Layouts engineered so robotic storage can be added later without tearing out the rack you install today.
The best time to find out a building cannot hold the operation is before the LOI, not after. Tenant reps use SOURCE Racks during the search to answer the questions that decide a deal.

What the tenant stores, how it moves, pallet weights, office headcount and the target move-in date.
AI assisted space planning run by experienced material handling people, back in as little as 24 hours.
Every scope priced together, used or new racking chosen on cost and lead time.
High pile and building packages prepared in house, plan check answered directly.
Racking, lighting, equipment and furniture on one schedule and one mobilization.
Inspections coordinated, punch list closed, product received on day one.
Solve is the SOURCE Racks program for brokers, owners and developers. Membership is by registration or referral, and it stays with you across every deal you bring in.
Want proof of what one team can deliver? See how we planned and installed a 60,000 sq ft warehouse racking project.

A warehouse tenant improvement contractor takes leased industrial space and makes it ready for the tenant's operation. For SOURCE Racks that means rack design and installation, high pile and building permits, lighting, sprinkler coordination, electrical, forklifts and conveyors, and the office, all managed by one project team.
Yes. We price each scope separately so the tenant rep can see what the allowance covers, what the tenant carries, and where used racking or phasing can close the gap.
A specified rack plan and pricing can come back in as little as 24 hours once we have the building dimensions and storage requirements. Solve members get priority turnaround.
Yes. Our in house permit department classifies the commodity, prepares stamped drawings and seismic calculations, submits to the local authority and answers plan check comments directly.
Our project team coordinates those trades through a vetted partner network on the same schedule as the racking, so there is one point of contact for the whole move-in.
Yes. We design, permit and install in every major metro in the country, sourcing material from the hub closest to the building to keep freight costs down.

Tell us about the building, what the tenant stores and the move-in date. We will handle the rest under one plan.