Warehouse Tenant Improvement Contractor for Move-In Ready Industrial Space

One contractor. One schedule. One person to call.

Signing the lease is the easy part. Between the keys and the first outbound truck sits racking, permits, lighting, sprinklers, electrical, equipment and the office. SOURCE Racks takes an empty warehouse to move-in ready under one project team.

01 / The Problem

Nine scopes. Nine vendors.
One late move-in.

Industrial tenant improvement rarely fails inside a single scope. It fails at the handoffs between them, and the tenant is the one left waiting.

The usual way
  • The electrician lights the empty building before anyone knows where the aisles go.
  • The rack designer never talks to the fire protection contractor, so flue space and sprinkler clearance get discovered at plan check.
  • The permit sits with the city while the install crew waits on a sign off.
  • Office furniture arrives on a different delivery window from a different vendor.
  • Every vendor finishes their piece. The tenant owns the gaps.
The SOURCE way
  • The rack layout comes first, so lighting, power and sprinklers are designed around how the building will actually run.
  • Our in house permit department prepares the high pile submittal and answers plan check directly.
  • Scopes are scheduled together, so the building gets one mobilization instead of five.
  • One project team is accountable for every field problem, start to finish.
  • The tenant gets a working warehouse, not a stack of separate invoices.
02 / Scope

Everything between the lease
and the first shipment.

A warehouse TI is a coordination problem as much as a construction problem. Here is what our team handles under one project.

01

Racking

Selective, push back, pallet flow, drive in, cantilever, mezzanines and catwalks, sourced used or new and spec'd to real pallet weights.

02

Permits and engineering

High pile storage permits, stamped drawings, seismic calculations, anchoring specs and plan check response, all in house.

03

Lighting

Warehouse LED lighting laid out over the final aisles and installed during the racking install.

04

Sprinklers

In rack requirements, flue space and deflector clearance coordinated with your fire protection contractor and the local authority.

05

Electrical

Power for forklift chargers, dock equipment, conveyor and office circuits, planned around the layout through our vetted partner network.

06

Equipment

Forklifts, conveyors and dock equipment matched to aisle width and clear height. See our warehouse equipment scope.

07

Office furniture

Workstations, private offices, conference rooms and break rooms, delivered and installed while our crews are already on site.

08

Automation ready

Layouts engineered so robotic storage can be added later without tearing out the rack you install today.

03 / For Tenant Reps

Bring us in before
the lease is signed.

The best time to find out a building cannot hold the operation is before the LOI, not after. Tenant reps use SOURCE Racks during the search to answer the questions that decide a deal.

  • Will it fit? A specified rack plan built on the building's real clear height, column spacing and dock layout, in as little as 24 hours.
  • What will it cost? One budget across racking, permits, lighting, equipment and office, so your client compares buildings on total move-in cost, not rent alone.
  • Is the TI allowance enough? Pricing broken out by scope, so you can show what the landlord's allowance should cover and negotiate from real numbers.
  • How long until we ship? A realistic permit and install timeline for that jurisdiction, from the team that will actually submit it.
SOURCE Racks crew installing pallet racking in an empty industrial building
Full time install crews, phased around the tenant's move-in date.
04 / Process

From empty shell to move-in ready.

01

Understand

What the tenant stores, how it moves, pallet weights, office headcount and the target move-in date.

02

Plan

AI assisted space planning run by experienced material handling people, back in as little as 24 hours.

03

Price

Every scope priced together, used or new racking chosen on cost and lead time.

04

Permit

High pile and building packages prepared in house, plan check answered directly.

05

Build

Racking, lighting, equipment and furniture on one schedule and one mobilization.

06

Hand over

Inspections coordinated, punch list closed, product received on day one.

05 / Solve for Brokers

Start every warehouse TI in Solve.

Solve is the SOURCE Racks program for brokers, owners and developers. Membership is by registration or referral, and it stays with you across every deal you bring in.

Your own direct lineA named Solve ambassador with real answers on feasibility, cost and timeline while the deal is live.
Pricing for the dealProgram pricing on racking, office furniture and equipment you can bring to the table.
Front of the lineSpace plans and budget ranges back in hours, so a good tour does not go cold.

Want proof of what one team can deliver? See how we planned and installed a 60,000 sq ft warehouse racking project.

Warehouse office furniture installed as part of an industrial tenant improvement
06 / FAQ

Frequently asked questions

A warehouse tenant improvement contractor takes leased industrial space and makes it ready for the tenant's operation. For SOURCE Racks that means rack design and installation, high pile and building permits, lighting, sprinkler coordination, electrical, forklifts and conveyors, and the office, all managed by one project team.

Yes. We price each scope separately so the tenant rep can see what the allowance covers, what the tenant carries, and where used racking or phasing can close the gap.

A specified rack plan and pricing can come back in as little as 24 hours once we have the building dimensions and storage requirements. Solve members get priority turnaround.

Yes. Our in house permit department classifies the commodity, prepares stamped drawings and seismic calculations, submits to the local authority and answers plan check comments directly.

Our project team coordinates those trades through a vetted partner network on the same schedule as the racking, so there is one point of contact for the whole move-in.

Yes. We design, permit and install in every major metro in the country, sourcing material from the hub closest to the building to keep freight costs down.

Start Your Project

Hand us the keys. Get back a working warehouse.

Tell us about the building, what the tenant stores and the move-in date. We will handle the rest under one plan.