Get estimate within 24 hours

Old tenant out. Next tenant in. Racking that fits the deal.
When a building changes hands, the racking the last tenant left behind can help the next lease or quietly kill it. SOURCE Racks tears it down, reconfigures it or gets it ready to market, so owners and listing brokers can show a building that works for the next occupant.
Racking is built around one operation. When that operation leaves, the aisles, beam heights and permits rarely match whoever tours the building next. Left alone, it slows showings, muddies the TI conversation and pushes back move-in.
There is no single right answer at turnover. The best path depends on the next likely user, the condition of the steel and how fast the owner wants rent to start.
Safe teardown and haul off of all racking, anchors and accessories, returning the warehouse to a clear shell for any type of tenant.
Change beam levels, aisle widths and row layout around the incoming operation, reusing sound uprights and beams wherever the design allows.
Keep the runs that suit the next user, clear the zones they need for staging, docks, production or automation.
Inspect, repair and document the existing system so it can be listed as an asset, with a rack plan prospects can understand.
The cheapest time to plan a turnover is before the first tour. Owners and listing brokers use SOURCE Racks to answer the questions that come up in every showing.

We document what is installed, rack condition, anchors, damage and what the existing permit covers.
A layout for the incoming tenant or a likely user, back in as little as 24 hours.
Removal, reconfiguration, new or used components and install, priced by scope.
High pile and building submittals updated for the new layout and answered at plan check.
Teardown, haul off and reconfiguration on one schedule, phased around move-out and move-in.
Inspections coordinated and punch list closed, so the new tenant receives product on day one.
Solve is the SOURCE Racks program for brokers, owners and developers. Bring a building in at turnover and get a named contact who can answer racking questions while the listing is live.
Short on components? We fill gaps with used pallet racking chosen on cost and lead time. Need more than racking? See our full warehouse tenant improvement scope.

Not always. Racking in good condition that suits common users can help a building lease, especially when it is inspected and shown on a rack plan. Racking built around one specialized operation is often better removed or reconfigured. A condition walk tells you which case you are in.
Safe dismantling of beams, uprights, decking and accessories, removing anchors, and hauling material off site, scheduled around the outgoing and incoming tenants.
Often, yes. Sound uprights and beams can be reconfigured to new beam levels and aisle widths. Damaged components are replaced, and used or new racking fills any gaps.
In many jurisdictions, changes to storage height, commodity or layout require an updated high pile submittal. Our in house permit department reviews the existing permit and prepares what the new layout needs.
A rack plan and pricing can come back in as little as 24 hours once we have building dimensions and the incoming storage requirements. Solve members get priority turnaround.

Tell us about the building, what is installed and the target lease date. We will map out the fastest path to move-in ready.