Get estimate within 24 hours

Racking Built Around Robotics in Grand Prairie, Texas

A national apparel brand needed pallet storage, dense carton picking, and a robotics system to share one 100,000 sq ft lease in Grand Prairie, Texas. SOURCE Racks designed the racking for warehouse robotics from the start, and delivered 1,100 pallet positions and 123,040 carton and tote positions with no rework when the robots went in.

This project story covers what owners, brokers, and developers can take from the job. For the stage by stage build with photos, see the full Grand Prairie project breakdown.

High-density carton racking built for warehouse robotics in Grand Prairie, Texas
SOURCE Racks crew installing racking around a robotics zone in Grand Prairie
  • Client: national apparel brand (confidential)
  • Location: Grand Prairie, Texas, in the Dallas Fort Worth market
  • Space: 100,000 sq ft tenant space in a 241,992 sq ft building
  • Racking area: about 33,000 sq ft
  • Robotics area: about 9,000 sq ft
  • Capacity: 1,100 pallet positions and 123,040 carton and tote positions
  • Scope: layout, engineering, permitting support, supply, and installation

Apparel fulfillment needs two kinds of storage at once: pallet positions for forklift putaway and replenishment, and very dense carton and tote pick faces for each picking. On top of that, a robotics system needed its own protected envelope on the same floor.

Aisle width, storage density, and the robotics footprint all competed for the same square footage. The robotics layout also kept changing while rack drawings were in review, so the racking plan had to move with it instead of locking in too early.

We used selective pallet racking with wire mesh decking on every level, configured two ways: wide span bays for pallet storage and tall, tightly pitched shelving runs for cartons and totes, with shelf spacing of 15 to 18 inches.

Around the robotics zone we added fencing, aligned rack runs with the electrical plan, moved the robotics section off the north wall, and added staging and tote storage where the system hands work to people. Elevations were updated to show the actual tote so clearances were checked against the real load, not a placeholder.

What Made This Robotics Project Work

Robotics Envelope First

We fixed the robotics zone before locking rack runs, so the automation never had to squeeze into leftover space.

Pallets and Totes Together

Wide span pallet bays and dense carton shelving share one floor, each sized to its own pick profile.

Separated Traffic

Forklifts, pickers, and robots each got their own paths, which cuts crossover points and congestion.

Drawings That Kept Up

The robotics layout changed several times in review. We revised elevations and rack runs with every change.

Code and Fire Ready

18 inches of clearance below sprinkler deflectors on every level, anchored frames, and load plaques throughout.

Project by the Numbers

ItemGrand Prairie result
Tenant space100,000 sq ft in a 241,992 sq ft building
Racking areaAbout 33,000 sq ft
Robotics areaAbout 9,000 sq ft
Pallet positions1,100
Carton and tote positions123,040
Building clear height32 ft
Typical aisle5 ft, wire guided
Dock and staging depth47 ft 8 in along the south wall
Forklift charging50 ft by 15 ft station at the west end

Lessons for Brokers, Owners, and Developers

  • Bring the racking team in early: robotics, racking, and fire protection decisions affect each other. Planning them together avoids tear outs after move in.
  • Design for the real load: size shelves and clearances to the actual tote or carton, not a generic box.
  • Plan the handoff zones: staging, tote storage, and returns areas are where robots meet people. They need space on day one.
  • Keep drawings live: automation layouts change. A racking partner who revises quickly keeps the schedule intact.
  • Make the space automation ready: our warehouse automation support team prepares buildings for robots, AMRs, shuttles, and conveyors. Brokers can also refer tenants through the Solve program.

Racking for Warehouse Robotics FAQs

It is racking designed around an automated system’s footprint, travel paths, and load profile. The rack layout leaves a protected envelope for the robots, keeps clearances for sprinklers and totes, and places staging where people and robots hand off work.

Often, yes. We review your current racking, floor, and layout, then show what can stay, what should move, and what must change. Our guide to automated pallet racking systems explains how automated storage works with racking.

We return initial layouts and estimates within 24 hours. Final drawings depend on how settled the robotics layout is. In Grand Prairie the layout was revised several times from late March to mid May while the automation plan was finalized.

Yes. Grand Prairie is one of several Texas markets we serve. See our warehouse racking services in Grand Prairie for local details, or browse more racking case studies.

Planning a Warehouse With Robotics?

Tell us about your building, your automation partner, and your storage goals. SOURCE Racks will design racking that fits the robots, the people, and the code, with a layout and estimate back within 24 hours.